WIND POWER: Vermont Leads the Way
Program Rights Date Range
-
NOLA Code:
WPVT 0000 H1
Number of Episodes/Length:
1 / 60
Genre:
Collections:
Rights End:
9/30/2029
Producer
Vermont Productions
Presenter
Vermont Public
Year Produced:
2026
Version:
Base
It is relatively unknown that in 1941 in Vermont, the first in the world megawatt-size wind turbine on Grandpa’s Knob, was connected to the local electrical grid. The 1.25-MW Smith-Putnam wind turbine was erected in Castletown, VT. It had two blades 75 feet in length. Incredibly, it took aver 40 years before this feat was once again accomplished. The documentary focuses on how this came about.
Program Rights
Broadcast Rights:
Unlimited
Rights Dates:
10/1/2026 - 9/30/2029
School Rights:
Concurrent with broadcast rights
V.O.D. Rights:
Yes
V.O.D. Rights Type:
Concurrent w/ Broadcast Rights via Media Manager
Linear Live Streaming:
Yes
Non-Commercial Cable Rights:
Yes
Program Contacts
Ian Sweet
United States
Underwriters
Blittersdorf Family Foundation
Robertson Foundation
Robertson Foundation